My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 8:35:50 AM
Creation date
1/10/2024 4:11:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0516248
PE
2361 - UST FACILITY
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1234 E YOSEMITE AVE MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r..5t: , <br />�. <br />6 IA <br />Desired tank capacity for shutO&O S <br />Dipstick Number on Tank Chartthat corresponds to 100% volume (Y) a (Y) <br />D lostidc Number on Tank Chart that corresponds to SO%tX)= <br />Upper Tube Reference Number Z -Y -X <br />2 <br />Upper T'vbe Depth Inside Tank C = 2.2' <br />Distance from rop sealing surface tw 7159 tip' to Inside the tC, <br />top of Storage Tanki - - <br />jF HattaT M!l7EWawdeiosanter <br />In al] cases forlgt�t4 71C 71 SD models, Ule top d the valve body must f]rotl We at least 6W Into the tank to <br />provide a minimal clearance for proper operation.' Additionally the total upper Tube Lerlgth must beat feast 16• <br />of length to include the protective bend M the tube. <br />Is C less than 6 W Yes / No <br />hf M Upper Tube t es+p h [al= C+ A <br />tf YMk UpperTube Lwsptft (M= 6'h 'r A <br />Upper Tuba Length = <br />Fpr 7esrabie 77 517 s ot111t <br />In all raTeS for Testable 7150 models, the top of the valve body must piotatde at least 6 35' into the tark to provide <br />a minimal clearance for proper operation,' Addidenally the total Upper Tube Length mu:l beat least 14 W of <br />length to include the protective bend in the tube. <br />Is C less than 5" Yes ! No <br />H Nob UpperTube t,enylb lQk C � A <br />tfY6 LppwTubaLErq&(D)<6'h'tA 11/i" <br />Upper Tube Length <br />Staling sutroce may be the top nfrhe Farr SeaJAdoaeor, the <br />bwh N sealing ledge lroirhe iwx Wl1J ron fotners or on rronwapar <br />tight applications the [op ofrhe pipe nippJt <br />Svffw ++dergtuund Srorage ronki atllUeo rnanwaysysrern at the COP. Make surr m uu tM top ofpitShnwgr tpnk kv jmkesvn- <br />mentandnortatnpofthenwrnvay. Cmsuftyour urrdelgAXMdtartkmanufacfuAvrfarheight Ofthe mmrwoy <br />'fhb meesuremerrc h taken ham the so:am where the upper rube is attached w the .afve body to rhe irrssde o1Yf*Tank top. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.