My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 8:35:50 AM
Creation date
1/10/2024 4:11:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0516248
PE
2361 - UST FACILITY
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1234 E YOSEMITE AVE MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE POCKEDURE ONLY. FOR STAMDARD t;O� <br />EIS. PROCEED TQ NEXT PAGE. <br />STEP ML IMSTALL SOCKS{ ADAMR ASSY <br />Put Cable thru threads in inlet tube and autthru cable <br />port on sMe of inlet tube. Thread the socket adaptor <br />assembly finger tight into the inlet tube- Nate: the ca_ <br />ble porton the inlet tube must be in line with the float <br />as shown previously in Figure 8A. <br />Socket ,� <br />adaptor <br />assembly, <br />~ table <br />port <br />Flqun 7r <br />STTeP 2Tr PASS GBLE TFMtU FERRULE <br />Pass cable thru ferrule. Loop cable and then pass cable <br />back ihru ferule. Keep ferrule loose until cable length <br />is dere Ancd in the next step. Nota If cable end hays <br />it may be necessary to trim the cable again to pass thru <br />ferrule. <br />1 r6' mandrel <br />rhrer <br />Ferree <br />Trim <br />after <br />Stcp3T Loop <br />Ffg�urc 1T <br />iTEP 3T: DETERMINE CABLE LENGTH <br />Run cable along upper tube and over the tap plate on <br />the float bracket as shnwn. With the float in the down <br />positron las shvw in Figur* M align loop in cable wlth <br />rivet and top hole in float bracket. Use the rivet as a <br />template to size the loop in the cable and pull cable <br />tight and crimp ferntle with crimping tool I pliers onto <br />cable at this location. Trim excess cable with wire cut- <br />ter I srissor54 ror reference, from the seam where the <br />upper tube and valve body meet to the end of the cable <br />after trimming will require approximately 35' of cable - <br />Cable overfloat brarJret <br />Seam <br />Flyttrr3T <br />5TFP 4T: ATTACH CABLE TO <br />FLOAT BRAr]�r <br />Ensuro cable is over the float bracket. UshV the suFr <br />plied rivet align loop in cable with top hole in float <br />bracket and pas: rivet thru Cable loop and float bracket <br />hate, Using rivet toot for Or dia mandrel attach rivet <br />and cable W the float bracket, See last page for list of <br />replacement moble pans. <br />FiQrthe �T <br />Attach rivet to tap hole <br />5TEP ST: ENSUAE PtiOPER CA9LE OPERATION <br />Unttvead the so'cluet adaptor assembly from the inlet <br />rube and ensure float and pappet more freely when <br />sorkct adaptor assembly is puled ar+. it should only <br />req u ire 3' to 4' or mpver nent Fn order to actuate the <br />floaI and poppet, Thread socket adaptor assimn*fin- <br />gertJght into inlet tube after testing. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.