My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 8:35:50 AM
Creation date
1/10/2024 4:11:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0516248
PE
2361 - UST FACILITY
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1234 E YOSEMITE AVE MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APRAndh <br />7i SO OverN YeMe Upper Tube alculirdan workshoet <br />t <br />SWA I V. 99 <br />desired tank capacity fpr strut-oH- SOS <br />Dipstick Number on Tanis Chart that Cuff espondsto1W%volume(Y) E7= (Y) <br />Dipstick Number on Tank Chart that corresponds to SO%(X} <br />Upper Tube Reference Number Z�Y-X <br />2 <br />Upper Tube Depth in side Tank C = 2.2' � (C) <br />Distance from top sealing surface tit 71501 tip' to inside tree <br />top of Storage Tank' <br />ibr NorcT hM 7TH nw+leie anM <br />In al] cases for t 71 so models, ttse top o1 tine valve body mute protrude at leasr 6 Yr" Into the tank to <br />provide minimal clearance for properoperatfon.l Additionally the total upper Tube Lerigth must be at feast 16' <br />of length ro include the protective bend in the tube. <br />Is C less than 6 th' Yes ! No <br />if"()G Tube LenW►(i7)=C+A <br />tf yekUpper Tube tarspltt ID)=6'n'r A <br />Upper Tube Lenglit = <br />TVI 7astabt e T s SU mntiels only <br />I n aU tries for Tesfa6Ye 7150 models, I he top of the valve body must plottude M least 635' into the tank to provide <br />a minimal clearance for proper operation? Additionally the total Upper Tube Length mu4if beat least 14 5S• of <br />length w include the protective bend in the tube. <br />Is C less than 5" Yes ! No <br />N H0. t1Vh� Tube Le+ryu Ipk= C � A - t i " <br />If VM UFipwn=om taq&(M 6'fi' * A 1V2" <br />Upper Tube Length <br />Sealing surface may be the rep of rhr Faer Seal Adapror, the bean in srafitrg tedgr lnsid¢ sate spill COntotnnY, or <br />on iron-vopnr <br />Iighi aipplirano»s the raP of tfre pipe nrpplt <br />Some (htde.ground Storage ranki uhlbro maimaysystem at the top, fbake sujv m use the ropo16*voragr ronk,hrmeawyew <br />menrandreatrorapofthemartway.[msuftYour unrlergmundtankmarMocrurerforheight ofthe Imaway <br />Yhks measurement h token horn the seam where the upper rube is attached to the .ofvr body to the Inside ofthe rank tap. <br />iG] <br />
The URL can be used to link to this page
Your browser does not support the video tag.