My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2024 11:34:25 AM
Creation date
1/12/2024 3:12:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0232494
PE
2361 - UST FACILITY
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
7373 WEST LN STOCKTON 95210
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 10 inch HG vacuum gauge <br /> Tank ID Diesel - T1 <br /> Tank Manufacturer Owens Cornng <br /> Tank Capacity 12,000 <br /> Test Start Time 8:OOam <br /> Initial Reading -10 HG <br /> Test End Time 9:OOam <br /> Final Reading -10 HG <br /> Change in Reading 0 Change <br /> Pass/Fail Criteria 0 Chnge 1 hr <br /> Tightness Test Results ® Pass ❑ Fail 1 ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 5 psi pressure gauge <br /> Pipe Run ID DSL- Supply DSL - Return <br /> Pipe Manufacturer Total Cont. Total Cont. <br /> Test Start Time 8:OOam 8:OOam <br /> Initial Reading 5 psi 5 psi <br /> Test End Time 9:OOam 9:OOam <br /> Final Reading 5 psi 5 psi <br /> Change in Reading 0 Change 0 Change <br /> Pass/Fail Criteria 0 Change 1 hr 0 Change 1 hr <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.