My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 11:34:13 AM
Creation date
1/16/2024 11:31:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231784
PE
2361 - UST FACILITY
FACILITY_ID
FA0003834
FACILITY_NAME
H & S ENERGY PRODUCTS LLC #3081
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
6633 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87-2 87-1 91 <br /> Are both vent and tank riser piping [71 Yes © Yes Q Yes 0 Yes <br /> secondarily contained? r] No 0 No R7 No 0 No <br /> OPE Model EBw EBw EBw <br /> What is the OPE response when El Shut off El Shut off © Shut off 57 Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) © Restricts EI Restricts © Restricts 0 Restricts <br /> Flow Flow Flow Flow <br /> © Audible © Audible FM Audible 0 Audible <br /> Alarm Alarm Alarm Alarm <br /> El Visual © Visual [M Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No r] No <br /> At what level in the tank is the OPE set to <br /> 84.125 86.25 84.5 <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 97.7 98.9 97.9 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to r Yes 0 Yes* 0 Yes* 0 Yes* <br /> respond when the stored substance © No ❑fT No No 0 No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results © Pass © Pass © Pass ® Pass <br /> 0 Fail 0 Fail ✓0 Fail � Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> All overfill prevention valves do not meet the required 95% shutoff. Drop tubes will need to be replaced before retesting. <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.