My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 11:34:13 AM
Creation date
1/16/2024 11:31:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231784
PE
2361 - UST FACILITY
FACILITY_ID
FA0003834
FACILITY_NAME
H & S ENERGY PRODUCTS LLC #3081
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
6633 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FFSPRO <br /> UST OVERFILL EQUIPMENT INSPECTION - DEFENDER SERIES" . <br /> VERFILL PREVENTION VALVE <br /> Facility Name: H&S#3081 Owner: H&S Energy <br /> Address: 6633 Pacific Ave. <br /> City,State,Zip Code: Stockton,CA 95207 Phone: <br /> Testing Company: Walton Engineering Phone:916-372-1888 Date: 1-30-2024 <br /> Product Grade: 87-2 87-1 91 <br /> —T <br /> 1.REFER TO THE MANUFACTURER'S TANK CHART. <br /> Tank Volume(gal) 9684 9684 9684 <br /> Tank Diameter(ft) 89.75 89.75 89.75 <br /> 95%Tank Volume(gal) 9200 9200 9200 <br /> (x Multiply Tank Volume by 0.95) <br /> 95%Volume Height(in inches)Based > > > > <br /> on Calculation Above 80.375 80.375 80.375 <br /> 2.PERFORM THE OVERFILL PREVENTION VALVE INSPECTION. <br /> Inspection performed?Flapper moves Yes Yes sr' Yes w"' Yes ❑ Yes ❑ Yes ❑ <br /> freely into the flow path? No ❑ No ❑ No ❑ No ❑ No ❑ No ❑ <br /> Measure"A"(in) 131.75 132 5 129.625 <br /> Subtract"Z"(in) 47.625 46.25 45.125 <br /> Subtract 4.5 in -4.5 -4.5 -4.5 -4.5 -4.5 -4.5 <br /> = Calculated 95%Final Shutoff <br /> Volume Height(in inches)Based on 84 .125 86. 25 84.5 2 z 2 <br /> Measurements Above <br /> Difi+ek-rice Between 1 and 2(equal or 3.75 5.875 4.125 <br /> less than=pass,greather than=fail) <br /> 3.DETERMINE WHETHER THE OVERFILL PREVENTION VALVE INSTALLATION PASSES THE INSPECTION. <br /> Find the Final Shutoff Volume in the 9460 9575 9482 <br /> manufacturer's tank chart. Enter the <br /> closest corresponding volume(gal). <br /> Divide by Actual Tank Capacity(gal) 9684 9684 9684 <br /> x Multiply by 100 977 .989 979 <br /> = Equals Final Shutoff Volume% 97 7 999 979 <br /> If the final shutoff volume percentage is 95%or less,the installation meets FFS and industry recommended practices.This percentage <br /> can, however,exceed 95%as long as the ullage volume remaining is greater than or equal to 250 gallons so that"none of the fittings <br /> located on the top of the tank are exposed to product due to overfilling"according to EPA 40 CFR, Part 280.The installation must also meet <br /> all applicable regulatory requirements,and must be acceptable to the Authority Having Jurisdiction. <br /> Enter Actual Tank Capacity(gal) <br /> Subtract Final Shutoff Volume(gal) <br /> = Equals Ullage Volume Remaining(gal) <br /> The OPV passes the installation Yes ❑ Yes ❑ Yes ❑/ Yes ❑ Yes ❑ Yes ❑ <br /> inspection? No tw/ No W111 No No ❑ No ❑ No ❑ <br /> Comments: <br /> Tester's Name(print) L f V ASO' Tester's Signature <br /> a-c_.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.