My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 11:32:29 AM
Creation date
1/23/2024 1:06:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0507837
PE
2361 - UST FACILITY
FACILITY_ID
FA0008057
FACILITY_NAME
H&S ENERGY PRODUCTS, LLC 3084
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3940 N TRACY BLVD TRACY 95304
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: ONMTEC - PROTEUS OEL8000111-CLD Series/INCON -STS Operations - Level 4 <br /> Sump/UDC ID 87 STP 91 STP Diesel East STP Diesel West STP <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Unknown (FRP) Unknown (FRP) <br /> Sump Depth (inches) 60 60 64 60 <br /> Sump Bottom to Top of 15 18 20 17 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:38 10:38 10:38 10:38 <br /> Initial Reading 8.793 12.862 13.400 11.232 <br /> Test End Time 10:53 10:53 10:53 10:53 <br /> Final Reading 8.793 12.862 13.400 11.233 <br /> Change in Reading 0.000 0.000 0.000 0.001 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail © Pass © Fail © Pass ❑l Fail <br /> Sump/UDC ID Diesel Retail STP Diesel Siphon STP UDC#1-2 UDC#3-4 <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Bravo(Steel) Bravo (Steel) <br /> Sump Depth (inches) 67 70 9 9 <br /> Sump Bottom to Top of 19 20 Bottom Bottom <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:05 12:05 12:43 12:24 <br /> Initial Reading 10.520 13.289 1.2413 0.8306 <br /> Test End Time 12:20 12:20 12:58 12:39 <br /> Final Reading 10.520 13.291 1.2414 0.8307 <br /> Change in Reading 0.000 0.002 0.0001 0.0001 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results 0 Pass 0 Fail © Pass 0 Fail 0✓ Pass © FailIM Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.