Laserfiche WebLink
Appendix B <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet - - - -- -- <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: -------rrn' <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude theProtective bend in the tube. <br /> (D) �� -20 — <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube,valve length. (D) <br /> (W)=/Zl -/l Y�� - Upper <br /> (U)= /Zo 113- Tube <br /> J <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note:If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension �+ <br /> (OPW 6111 &61TP models add 0.6") ( e Valve 1{l <br /> bottomof <br /> From the tank calibration chart provided by tank manu- <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 100%volum . (B) <br /> To Tank <br /> M <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> /� �j/ Length, 100% <br /> (X)toB) <br /> (B) (D)-2„-��' y' Z O CJ - top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank i 4' <br /> I� <br /> manufacturer determine the tank capacity at the cal- !1 <br /> culated(X)dimension and the 100%volume(Y)tank <br /> capacity. <br /> (X)tank capacity in gallons= �� <br /> (Y)tank capacity in gallons= 11AL \1i`t' Nty - I <br /> SO%_(X)capacity/(Y)capacity x100= '�0 VV <br /> Note: The overfill valve must be installed per AM require- <br /> ments and all applicable local,state,and national codes. If <br /> - the overfill valve is set above the allowable shut-off percent- <br /> 1 age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />