My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 1:15:53 PM
Creation date
1/24/2024 1:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231766
PE
2361 - UST FACILITY
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
4344 E Waterloo RD Stockton 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br /> (1)REPLACD THE 91 TANK'S TURBINE SUMP SENSOR - <br /> iN� Z <br /> / VR-794380.208 <br /> D <br /> Vz <br /> IO W <br /> W <br /> _i <br /> ; N.m � <br /> • 1- W»�. _ <br /> 0_'UU�T�L <br /> :mga� 4Eo <br /> <Wt:M <br /> z ¢— 'TD <br /> 0 <br /> a 0 LL�mo �u� <br /> -,0 <br /> ��, eeee eeeee ee <br /> ® U <br /> Q <br /> 0 <br /> SHEET INDEX <br /> D <br /> F-I FUELING <br /> PLAN 2 <br /> F-1 FUELING DETAIL <br /> W <br /> q I] ® W <br /> PROJECT DATA <br /> F I IL, I PROJECT NAME: CHEVRON DISPENSER REPLACEMENT ❑ <br /> ll eJ w O PROJECTAODRESS: 4344 E WATERLOO STOCKTON,CA.95215 <br /> PARCEL NUMBER: XXXX-XXX-XXXX-X <br /> FACILITY OWNER: CHEVRON PRODUCTS COMPANY p <br /> u< <br /> PROPERTY OWNER: P.O.BOX 6004,SAN RAMON,CA.MISS <br /> BUILDING CODES: 2019C C' CALIFORNIA BUILDING CODE OD <br /> 2019CMC: CALIFORNIA MECHANICAL CODE p <br /> tl� a <br /> 2019C C: CALIFORNIA PLUMBING CODE <br /> 201 O) <br /> 9 CEC: CAUFORNIA ELECTRICAL CODE <br /> 2079 CFC: CALIFORNIA FIRE CODE F-- <br /> 2019 CALIFORNIA FIRE CODE FOR BUILDING CONSERVATION Z <br /> Nnosm +Fav 6) 2019 CAL <br /> IFORNA EFFICIENCY STANDARDS W L>7 <br /> 2DI9 NFPA 30 IS 2018 NFPA 30A,2017 NFPA 70 <br /> WATERLOO ROAD <br /> IL D_LU U <br /> Q of �O <br /> CL Ld F <br /> Uj <br /> GENERAL NOTES VICINITY MAP LU co OF <br /> S.ALLWORKTOBECOMPL DINACCORDANCEOFCURRENT AND APPLICABLE BUILDING/ELECTRICAL CODES,FIRE CODES. 6.CON TRACTOR RESPONSIBLE TOCDORDINATEAU INSPECTIONS WITH FIRE AND LOCALAIR CONTROL DISTRICTS U) ���co <br /> STATE <br /> WATER BOARD AND LOCAL CUPA REQUIREMENTS AS WELL AS CARS AND LOCALAIR CONTROL DISTRICTS. 7.CONTRACTOR RESPONSIBLE TO PULL 1166 PERM[W IDI SCAQMD FOR MINOR EKCANATION AT TANK AREA <br /> i.(FATE UNDERGROUND WORK IS BEING COMPLETED,CONTRACTOR IS RESPONSIBLE FOR CONTACNNG AND COORDINATING S.CDNTXACTOR RESPONSIBLE To CALIBRATE AND SUBMIT VIACE IN SERVICV NOTIFICATION TO GOVERNING s DRAWN BY:DI: M <br /> UNDERGROUND SERVICE ALERT(USA)AND MARKINGTHE SITE IN ACCORDANCE OF DIG ALERT REQUIREMENTS- WEIGHTS AND MEASURES DEPARTMENT FOR METER CALIBRATION OF ANY MEASURING DEVICFS. &I` Q REVIEWED BY: <br /> DIAL 911,(BCD) -360008 FILE EUURONICALLYATH S://WWW.DIGAURT.ORG/ 9.NSTOMER REQUIRES PRE-TEST OFTRE VAPOR RECOVERY SYSTEM PRIOR PIACING IN SERVICE. —N— .. DATE:112723 <br /> 3.ALL WO0.K IS TO BE COMPLETED BYA LICENSED AND INSURED CONTRA CTOR WITH THE STATE Of CALIFORNIA TO BE PERFORMED AND OR COORDINATED BY CONTRACTOR ON BEHALF OF CHEVRON. $LNWM:K] <br /> 4.ALWORKLSTO BE COMPLETED SYCOMPETENTAND CERTIFIED TECHNICIANS)WITH CURRENTAND APPLICABLE 10.CONTRACTOR TO COORDINATE ANY INSPECTIONS WITH GOVERNING AGENCIES INCIUNNGINSPECT-10f I Q JOB NO:567267 <br /> ICCCERTIFIGTIONS AS W BLAS REQUIRED MANUFACTURER TMINING/CERTIFICATIONS. FUELING SYSTEM BY CUPA/FIRE AS WEMAS COORDINATION OF A FINAL WALKTHROUGH W ITN THE CHEVRON PENING. SHEET <br /> 5.ND ADDITIONAL ELECTRICAL LOADS ARE BEING INTRODUCED AS PART OF THIS UPGRADE/INSTALLATION. PROTECT MANAGEMENT TEAM FOR A FINAL OAQC INSPECTION PRIORTO O <br /> 11.AU-WORK AREAS TO BE SAFELY BARRICADED.WORK TO BE COMPLETED SAF ELY FOLLOWING INDUSTRYSTANDARD <br /> API AND OSHA REQUIREMENTS HYckbbnry'. <br /> A�M-I R I.—I <br /> FO <br />
The URL can be used to link to this page
Your browser does not support the video tag.