Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 12/14/2023 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: LATHROP GAS&FOOD 140 LATHROP ROAD LATHROP CA 95330-9718 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . *PIPING <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drawing ofpiping <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . exit of sump and <br /> UDC's.No <br /> DIE . . . . . . . . . . . . underground <br /> drawing is <br /> L C _ _ _ C accurate,we <br /> O X . . . cannot speculate <br /> , O blue prints. <br /> . . . . . . . . . . . . . . . . . . . . <br /> . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> 91 <br /> .0 . . . C . . . . . . . C <br /> L <br /> 87 c . . . . . . . . . C <br /> OL . . . . . . . . . . . . . . . . . . . . . . . . . <br /> OF v V X . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> CAR WASH lar STORE <br /> A= �,c�Ix Saar <br /> F=FIU5 <br /> P=PRUE <br /> L=Twbiiwi L m kDetmor . . <br /> X=a7�1P 9 N S M TLS <br /> B=SimeS�aor <br /> 5=Smart Sensor <br /> C:=Fbata&CLama <br /> E=E Stop <br /> I*rlena rin*rgrarmd1Jmd r n&wsiS1e I&lOv cerr&.Yrg 1wJNrdar awa <br /> F.r"ria:Srorn/oprraureo 'AndReSals,�i'faxir�ormrlionxlprrrpza. J�rznrirg <br /> rot f0 sede <br /> Date map was drawn:12/16/20 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />