My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2758
>
2300 - Underground Storage Tank Program
>
PR0541416
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 1:54:31 PM
Creation date
1/24/2024 4:20:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0541416
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0023733
FACILITY_NAME
Sunwest Chevron
STREET_NUMBER
2758
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
Lodi
Zip
95242
APN
16646031
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2758 W Kettleman LN Lodi 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Sunwest Chevron as of January 09, 2024. <br /> Open violations from October 17, 2023 inspection <br /> Violation#208-Failure to comply with the designated operator inspection requirements. <br /> 1)OBSERVATION: Designated operator reports were not signed within the required time frame. <br /> -The designated operator reports were not signed by the owner/operator. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> ---------------------------------------------- <br /> 2)OBSERVATION:The designated operator failed to document all the alarms from the attached alarm history on <br /> the designated operator inspection reports and failed to check that they were responded to appropriately. The <br /> missing alarms include: S17 no vacuum alarms and L1, L2, L3, L4, L5, L6, L9 low liquid alarms on 11/9/20222 <br /> 1/2/2023, 2/25/2023, 2/27/2023, 7/6/2023, 8/30/2023, 9/2/2023, 9/13/2023, 9/16/2023, 9/17/2023, 9/19/2023, <br /> 9/21/2023 <br /> REGULATION GUIDANCE: During the inspection,the designated operator shall review the alarm history since the <br /> previous inspection, check that each alarm was documented and responded to appropriately, and attach a copy of <br /> the alarm history with documentation taken in response to any alarms to the inspection report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> ---------------------------------------------- <br /> 3)OBSERVATION:The designated operator inspections for the following months were performed more than 30 <br /> days after the previous inspection: <br /> - Initial inspection on 12/16/2022, next inspection performed on 1/17/2023(32 days) <br /> - Initial inspection on 5/5/2023, next inspection performed on 6/5/2023 (31 days) <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection. <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> ---------------------------------------------- <br /> 4)OBSERVATION:The designated operator failed to check and note all required items on the visual inspection <br /> reports.The incorrect and missing information included the following from the inspection reports: <br /> -The designated operator's monthly inspection reports did not include the designated operator's name, certification <br /> expiration date, signature, and date of when inspections were provided to the owner. <br /> -Section 5 was missing the UST owner/operator's response. <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.