Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMP/UDC TEST <br />Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br />Test Equipment Used: Incon STS Tester <br />Sump/UDC ID <br />87 STP <br />91 STP <br />Diesel STP <br />Sump Manufacturer <br />Bravo <br />Bravo <br />Bravo <br />Sump Depth (inches) <br />61°° <br />603/4" <br />61 5/8" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />14" <br />16" <br />16" <br />Test Start Time <br />11:50 am <br />11:50 am <br />11:50 am <br />Initial Reading <br />4.2167 <br />0.2934 <br />4.9045 <br />Test End Time <br />12:05 pm <br />12:05 pm <br />12:05 pm <br />Final Reading <br />4.2161 <br />0.2925 <br />4.9037 <br />Change in Reading <br />0.0006 <br />0.0009 <br />0.0008 <br />Pass/Fail Criteria <br />0.0020 <br />0.0020 <br />0.0020 <br />Tightness Test Results <br />p Pass ❑ Fail <br />0 Pass ❑ Fail <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass ail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />