My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2802
>
2300 - Underground Storage Tank Program
>
PR0516736
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 3:21:05 PM
Creation date
1/24/2024 4:27:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0516736
PE
2361 - UST FACILITY
FACILITY_ID
FA0012764
FACILITY_NAME
SAFEWAY FUEL CENTER #1769
STREET_NUMBER
2802
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2802 COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />87 <br />91 <br />DSL <br />Are both vent and tank riser piping <br />❑✓ Yes <br />❑✓ Yes <br />❑✓ Yes <br />❑ Yes <br />secondarily contained? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />OPE Model <br />Defender <br />Defender <br />Defender <br />What is the OPE response when activated? <br />OShut off <br />OShut off <br />Shut off <br />❑Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />❑Restricts <br />❑Restricts <br />[—]Restricts <br />❑Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />that may interfere with the OPE operation? <br />❑✓ No <br />❑✓ No <br />✓❑ No <br />❑ No <br />At what level in the tank is the OPE set to <br />activate? (Inches from bottom of tank) <br />103.25 <br />103.25 <br />103.75 <br />What is the percent capacity of the tank at <br />which the OPE activates? <br />91.7 <br />91.7 <br />92 <br />Is the OPE in proper operating condition to <br />✓❑Yes <br />❑✓ Yes <br />❑✓ Yes <br />❑ Yes <br />respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />✓❑ Pass <br />❑✓ Pass <br />❑✓ Pass <br />❑ Pass <br />OPE Inspection Results <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail' and each proposed remedy. <br />Alternative Contractor Installed All Drop Tubes - SSS Tested Only. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.