Laserfiche WebLink
6 <br />iota HE <br />Secondary Flow Communication Test Certification <br />Location: CGRS Project No : 61-28095 <br />Safeway Test Date: April 1, 2024 <br />2802 Country Club Blvd CGRS Techs: Richard Thomas <br />Stockton, CA 95204 Adam Montejano <br />CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed <br />throughout the secondary piping components listed below. <br />Piping Secondary Communication Confirmation <br />COMPONENTS <br />RESULTS <br />87 PI -1 <br />Pass <br />87 PI -2 <br />Pass <br />91 PL <br />Pass <br />DSL PL <br />Pass <br />IOTA Tech Signature: <br />Reviewed by: <br />Richard Thomas CA Tank Tester #06-1672 <br />Chris Murphy Dir`ecfor of CA Services <br />4/1/2024 <br />Date <br />4/2/2024 <br />Date <br />