Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used:Incon Tester <br /> Sump/UDC ID 87 STP 91 STP Diesel STP <br /> Sump Manufacturer Western Fiberglass Western Fiberglass Western Fiberglass <br /> Sump Depth (inches) 65" 659' 65" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 149' 14" 14" <br /> (inches) <br /> Test Start Time 10:05 am N/A 10:05 am <br /> Initial Reading 5.6659 N/A 5.6403 <br /> Test End Time 10:20 am N/A 10:20 am <br /> Final Reading 5.4152 N/A 5.6402 <br /> Change in Reading 0.2507 N/A 0.0001 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results ❑ Pass 0 Fail ❑ Pass 0 Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 87 FILL 91 FILL Diesel FILL <br /> Sump Manufacturer Western Fiberglass Western Fiberglass Western Fiberglass <br /> Sump Depth (inches) 659' 659' 659' <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 16" 169' 44" <br /> (inches) <br /> Test Start Time 9:05 am 9:05 am 9:27 am <br /> Initial Reading 5.0529 3.6489 4.9058 <br /> Test End Time 9:21 am 9:21 am 9:42 am <br /> Final Reading 5.0521 3.6500 4.9058 <br /> Change in Reading 0.0008 -0.0011 0.0000 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />