Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />9. COMMENTS <br />91 East & 91 West Secondary Piping Failed Due to Inability to Secure Test Boots Over Secondary Line. Secondary Lines <br />Need to be Cut Back from Primary & Torn Product Penetration Boot to 91 Piping. <br />87 & 91 STP Sumps Failed Due to Torn Product Penetration Boots. <br />Diesel Fill Sump Increased. Adjust / Compensate for Increase. Block for Wind; Eliminate Potential Vibrations; Adjust for <br />Traffic; Adjust for Testing Probe - Retested and Passed. <br />UDC 15/16 Failed Due to torn 91 Product Test Boot. <br />UDC 7/8 Increased. Adjust / Compensate for Increase. Block for Wind; Eliminate Potential Vibrations; Adjust for Traffic; <br />Adjust for Testing Probe - Retested and Passed. <br />No Inspector Present. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 5of5 <br />