Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Notes: Repairs made on T-1 Diesel south product line were performed by another contractor. <br /> Retested product line and confirmed line would not hold pressure. No visible leaks at STP <br /> sump or UDCs. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5of5 <br />