My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2021-2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LIBERTY
>
19133
>
4400 - Solid Waste Program
>
PR0542433
>
CORRESPONDENCE_2021-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 9:45:28 AM
Creation date
2/5/2024 12:11:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2021-2024
RECORD_ID
PR0542433
PE
4430
FACILITY_ID
FA0024385
FACILITY_NAME
MULHAIR DISPOSAL SITE
STREET_NUMBER
19133
Direction
E
STREET_NAME
LIBERTY
STREET_TYPE
RD
City
CLEMENTS
Zip
95227
CURRENT_STATUS
01
SITE_LOCATION
19133 E LIBERTY RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health and Safety Plan <br />19133 East Liberty Road, Clements, California <br />August 16, 2022 (Revised June 27, 2023) <br />Page 20 <br /> <br />Sharp Environmental Technologies, Inc. <br />• Utilize appropriate engineering controls (e.g., ventilation), work practices, and PPE as <br />needed. <br />• Trenches in excess of 3 feet deep must have steps or ladders located so that all workers <br />within the trench are within 25 feet of a place of exit [OSHA, Title 29 CFR 1926, Sections 651 <br />and 652]. <br />• Excavated material shall be placed at least 2 feet from the edges of excavations, unless <br />effective barriers are in place to prevent the excavated material from falling into the <br />excavation. <br />Precautions to prevent cave-in (as described below) should be strictly followed. <br />The following conditions increase the likelihood of cave-in: <br />• Soil materials composed of unconsolidated, uncompacted, and/or rounded particles. <br />Special care must be used when trenching in areas which have previously been excavated <br />and backfilled. <br />• Soils which have a high-water content. <br />• Loading of trench walls by adjacent equipment, supplies, structures, backfill piles, etc. <br />• Vibration due to equipment operating near excavations. <br />• Trench walls which are steeper than the angle of repose of the material composing the walls. <br />• Deep trenches (i.e., high trench walls). <br />The following precautions should be used to prevent cave-ins in all trenches in excess of 5 feet deep. <br />These precautions should also be used in trenches less than 5 feet deep whenever those site conditions <br />just listed indicate the likelihood of a cave-in: <br />• Sloping. Trench walls should be sloped to the correct angle of repose. <br />• Shoring. Vertical trench walls (unless composed of solid rock) must be shored and braced, or <br />restrained with movable trench boxes, to prevent cave-ins. <br />• Shoring systems must be designed by qualified person and meet accepted engineering <br />requirements. <br />• Shoring must be installed from the top down and removed from the bottom up. <br />• Additional precautions (e.g., added shoring bracing or a flatter slope angle) should be <br />utilized whenever site conditions indicate that they are needed to prevent cave-ins. <br />• Excavations should be inspected by a competent person daily, and after any event (e.g., <br />rainfall) which may increase the likelihood of cave-in. If inspection indicates the potential <br />for a cave-in, all work should cease until appropriate precautionary measures are taken. <br />Trenches which (1) will not be entered by workers; and (2) will be immediately backfilled (e.g., for <br />permeable treatment walls) are exempted from the requirements listed here. <br />When the procedures outlined above are followed, trenching can be a useful control on a hazardous <br />waste site. It should be emphasized that construction hazards must be avoided as much as chemical <br />exposure hazards.
The URL can be used to link to this page
Your browser does not support the video tag.