My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2300 - Underground Storage Tank Program
>
PR0231002
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2026 7:02:15 PM
Creation date
2/7/2024 10:52:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231002
PE
2361 - UST FACILITY
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
525 W ACACIA ST STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Mod Wld-Dwst=Modern Welding Double Wall Steel Tank. Fuel Oil-S=Fuel Oil Supply. <br /> Fuel Oil-R=Fuel Oil Return. Ameron FRP=Ameron Fiberglass Reinforced Plastic. <br /> Mod Wld=Modern Welding. <br /> Note: Tank has a Tank Secondary Containment Vent to atmosphere. Tank Secondary <br /> Containment vacuum applied from Tank Secondary Containment Atmosphric Vent Riser with Tank <br /> Secondary Sensor Riser plugged. This method is necessary due to the configuration of the Tank <br /> Secondary Containment Sensor Riser and Sensor Electrical Conduit manifold. <br /> Note: Secondary Pipe Run #1 Supply and Secondary Pipe Run #2 Return are manifolded together <br /> at the Piping Sump. Applied pressure represnets Secondary Pipe for Supply and Secondary Pipe <br /> for Return, during test period. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.