My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1720
>
2300 - Underground Storage Tank Program
>
PR0547827
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 10:59:43 AM
Creation date
2/12/2024 11:15:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0547827
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027253
FACILITY_NAME
CHARTER WAY 76
STREET_NUMBER
1720
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16382070
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1720 S FRESNO AVE STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for CHARTER WAY 76 as of February 02, 2024. <br /> Open violations from December 27, 2023 inspection <br /> Violation#107-Failure to submit and maintain complete and current financial responsibility documents. <br /> OBSERVATION: Current financial responsibility documents were not found on site. <br /> REGULATION GUIDANCE:A copy of current financial responsibility documents are required to be maintained on <br /> site. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br /> copy on site. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#116-Failure to submit the"Spill Container Testing Report Form"within 30 days. <br /> OBSERVATION:Annual spill container testing was performed on 12/27/2022 and a test report was submitted on <br /> 03/08/2023,41 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#118-Failure to submit the"Overfill Prevention Equipment Inspection Report Form"within 30 <br /> days. <br /> OBSERVATION:An overfill prevention equipment inspection was performed on 12/27/2022 and a test report was <br /> submitted on 03/08/2023,41 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.