Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer ✓ Industry Standard Professional Engineer <br /> Test Type Pressure ✓ I Vacuum Hydrostatic <br /> Test Equipment Used:Vacuum Gauge <br /> Tank ID 87 W 87 C 97 E 91 <br /> Tank Manufacturer Xerxes Xerxes Xerxes Xerxes <br /> Tank Capacity lox lox lox lox <br /> Test Start Time 6:57AM 6:45AM 7:12AM 7:24AM <br /> Initial Reading -lopsi -lopsi -lopsi -lopsi <br /> Test End Time 7:57AM 7:45AM S:12AM 8:2 4A <br /> Final Reading -lopsi -lopsi -lopsi -lopsi <br /> Change in Reading opsi opsi opsi opsi <br /> Pass/Fail Criteria opsi +/- opsi opsi +/- opsi <br /> Tightness Test Results ✓ Pas Fail ✓ Pass Fail ss[:]Fail IF—./]Passl IFail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer ✓ Industry Standard Professional Engineer <br /> Test Type ✓ Pressure Vacuum Hydrostatic <br /> Test Equipment Used:Pressure Gauge <br /> Pipe Run ID 87 P 91 87-1 to e7-3 vent <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 7:17AM 7:23AM 7:0 1A 7:20AM <br /> Initial Reading 5psi 5psi 5psi 5psi <br /> Test End Time 8:17AM 8:23AM 9:01AM 8:20AM <br /> Final Reading 5psi 5psi 5psi 5psi <br /> Change in Reading opsi opsi opsi opsi <br /> Pass/Fail Criteria opsi +/- opsi +/- opsi opsi <br /> Tightness Test Results ✓ Pass Fail JZPassj IFail 11 jPassj IFail IF-/_jPassj IFail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Pass Fail Pass Fail Pass Fail IoPasCFail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />