Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by Manufacturer v/ Industry Standard Professional Engineer <br /> Test Type 0 Pressure ILI Vacuum y/ Hydrostatic <br /> Test Equipment Used:TS-STS <br /> Sump/UDC ID 1/2 3/4 5/6 7/8 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 36" 36" 36" 36" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 12-- 1211 121- 1211 <br /> (inches) <br /> Test Start Time 11:24AM 11:43AM 11:24AM 11:24AM <br /> Initial Reading 2.81061, 3.1611" 1.6587" 1.8026" <br /> Test End Time 11:39AM 11:58AM 11:39AM 11:39AM <br /> Final Reading 2.8105" 3.1604" 1.6596" 1.8032" <br /> Change in Reading 0.00011, 0.000711 0.00091, 0.00061, <br /> Pass/Fail Criteria +/- 0.00211 +/- 0.00211 +/- 0.00211 +/- 0.00211 <br /> [Tightness Test Results Z/ Pass Fail E,/ Pass Fail Z/ Pass Fail ZPass Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Pass Fail Pass Fail ass Fail Pass Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />