Laserfiche WebLink
SP-5 <br />SWT Engineering <br /> <br />(Z:\PROJECTS\SiteLogIQ\Site Characterization Work Plan\Appendices\Appendix B - Sampling and Analysis Plan\Appendix B - Sampling and <br />Analysis Plan_021424.docx) <br />◼ Sampler’s name(s) <br />◼ Date and time of sample collection <br />◼ Designation of sample as composite or grab <br />◼ Type of sample (soil, sediment or water) <br />◼ Type of sampling equipment used <br />◼ Field instrument reading, if applicable <br />◼ Field observations and details related to analysis or integrity of samples <br />(e.g., weather conditions, noticeable odors, colors, etc.) <br />◼ Preliminary sample descriptions <br />◼ Sample preservation <br />◼ Sample identification numbers and explanatory code <br />◼ Name of recipient laboratory <br />In addition to the sampling information, deviations from the sampling plan and the level of health <br />and safety protection required to perform sampling will also be recorded in the logbook. <br />2.2 Photographs <br />Photographs will be taken at the sampling locations. The photos will verify information entered <br />in the field logbook. Each photo taken will have a caption in the logbook with the approximate <br />time, date, and location. <br />2.3 Reporting <br />Once the excavation activities, waste sampling are completed and the analytical results are <br />received and evaluated, SWT will prepare a completion report for submittal to the San Joaquin <br />LEA and RWQCB within 30 days after receipt of the final analytical results. <br /> DRAFT