My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 1:30:42 PM
Creation date
2/26/2024 9:26:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> XCheck this box if tank gauging is used only for inventory control. <br /> []Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and termination; ❑ D <br /> and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ❑ D <br /> ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? D D <br /> Probe 1D Probe Model Tanks Monitored Pass Fail <br /> El <br /> El <br /> ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or"Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> 1) All Veeder Root sensors 79380-323 were replaced with 794380-208 sensors and Cold Start the Veeder <br /> Root under permit SR0087468 <br /> 10. MONITORING SITE PLAN <br /> Page 5of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.