My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 1:30:42 PM
Creation date
2/26/2024 9:26:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2 . 19 `�- s <br /> Appendix B <br /> 71 SO Overfill Valve in Tank Initial Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructio is. All length measurements are in inches. Please contact the Authority having Jurisdic- <br /> tion (AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity i your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the followinc measurements with the valve in- <br /> stalled in the tank 41t, <br /> Distance <br /> Distance from the 71 SO inlet tube flange to the Zast � <br /> lug in the 71 SO bc dy(see figures),upper tube length. P <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> Distance from the 1 SO inlet tube flange to the top and i <br /> bottom of lower to e,valve length. I r <br /> (W)= j (D) <br /> = 3 Upper <br /> (U) <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom -- ----.-1.-- J.� -=�---.-of the tank. Note: I a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 61 1 1 &61 TP models add 0.6") (W)Valve <br /> (B) Length, <br /> bottom of` <br /> From the tank tali ration chart provided by tank manu- �lL cut <br /> facturer find the di stick number(Y) which corresponds <br /> tothe 100%voW e. (B) <br /> (Y)_ / To Tank y <br /> / Y9 * i ' `y) <br /> 1. To determine but-off percentage: I V) Tank <br /> Subtract upper to e length (D)from distance to tank (U)Valve g Chart �f <br /> bottom (B) Length, —� 100% !I <br /> (X)_(B)—(D)-2„ �j a' 3 )_(32 0 -MY top of cut Volume If <br /> f Y/$5 Dipstick j! <br /> Using the tank ca ibration chart provided by the tank <br /> manufacturer del ermine the tank capacity at the cal- l <br /> culated(X)dimension and the 100%volume(Y)tank <br /> capacity. d <br /> Al <br /> (X)tank capacity n gallons= <br /> (Y)tank capacity n gallons= SYS 4-6 <br /> SO%=(X)capaci y/(Y)capacity x100= Y- <br /> Note: The overfill valve must be installed per AHJ require- <br /> 1 ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> 1(01 (� I age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.