My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021-2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
COMPLIANCE INFO_2021-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 4:06:55 PM
Creation date
2/26/2024 2:52:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021-2022
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compostable Materials Handling Operation and Facility Inspection <br />Report (93) <br />Forward Resource Recovery Facility (39 -AA -0020) <br />period of 15 days or longer. During the period when the compost is maintained <br />at 55 degrees Celsius or higher, there shall be a minimum of five (5) turnings <br />of the windrow. <br />bI ) Ensure accurate records are maintained. <br />Areas of Concern <br />14 CCR 17868.1 (a) -Sampling Requirements <br />A lab analysis report was not available for September 2021. <br />a.) Facility must comply with all terms and conditions listed in the <br />Solid Waste Facility Permit (SWFP). <br />b.) Per condition I under section number 16 of the SWFP, the facility <br />must take and have analyzed one sample per 5,000 cubic yards of finished <br />compost. Facility must submit report on a monthly basis to the LEA. <br />c.) Submit lab report to the LEA for the month of September 2021. <br />Inspection Report Comments <br />1. The previous violation, 17867(a)(9) for Fire Preventi <br />on, Protection and Control, has been corrected. <br />The temperatures of the windrows were below 171F. <br />2. Fly traps contained water and were utilized. The fly population was light. <br />3. Track out onto Austin Road was light. <br />4. Odors were normal. <br />5. The weather during the inspection was 52F, with a wind speed of 6 mph. <br />6. Records were reviewed from September 29, 2021 to October 15, 2021. <br />7. The following temperatures were measured during the inspection. Incoming green waste was 80F. <br />Ground green waste was 128F. Windrows ranged from 123E to 150F. Finished compost measured 136E <br />and the finished product was 93F. Temperature for the overs were 72F. <br />Attachments <br />Forward Resource Recovery Facility -Compost Photos <br />CalRecycle Page 2 of 2 <br />Solid <br />Waste <br />Information <br />System <br />(SWIS) <br />
The URL can be used to link to this page
Your browser does not support the video tag.