My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:52:50 AM
Creation date
2/28/2024 1:15:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231125
PE
2361 - UST FACILITY
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1210 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 DIESEL <br /> Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? 0 No 0 No 0 No ❑ No <br /> OPE Model FF DEFENDER FF DEFENDER FF DEFENDER <br /> What is the OPE response when activated? 0 Shut off 0 Shut off 0 Shut off ❑ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? 0 No 0 No 0 No ❑ No <br /> At what level in the tank is the OPE set to 108.5 109.5 109.5 <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 90.7% 91 .4% 91 .4% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to 0 Yes 0 Yes 0 Yes ❑ Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results 0 Pass 0 Pass 0 Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.