Laserfiche WebLink
10,000 gallon tank <br /> Considerations or Recommended Repairs <br /> 2. Confirm that the currently installed 8-in emergencyvent is for the interstitial (secondary tank) <br /> tank. <br /> -Confirmed <br /> 3. Consider applying touch up coatings to the isolated areas of coating failure. <br /> —Budgeted for 25-26 FY <br /> 4.The normal venting is insufficient. Consider installing a normal vent 4-in or greater. <br /> —25-26 FY <br /> 5. Consider re-sealing threaded connections or replacing threaded connections with seal-welded <br /> Components. <br /> —25-26 FY <br /> 6. Consider servicingthe existing normal, emergencyvents, and manway long bolts to assure <br /> proper <br /> operation and prevent damage from over or under pressure. <br /> —25-26 FY <br /> 7. Consider servicing the overfill and level gauge systems to assure proper working order. <br /> —25-26 FY <br /> 8. Consider installing redundant secondary containment with %110 of the tank's capacity. <br /> —Tank is double wall <br /> 9. Consider relocating existing fire extinguisher in case of fire to insure accessibility. <br /> —Moved for better access <br /> 10. Consider installing a leak detector in the interstice. <br /> —Budgeted for 25-26 <br />