Laserfiche WebLink
�Va <br /> i 8281 Wim`^'•� <br /> Buena Pal��rh A, `J <br /> Lkense N:3pp��Z1 0\0,5,3\e <br /> ea\e' <br /> 5tG° �a qP me< <br /> �o ,as <br /> 30 t <br /> Job: 559940 <br /> ey <br /> Severity; 4 Hour dt <br /> Job: 559940 �gR1EL VENEGAS ;C <br /> l Tech: Respond BY: 8/28/2023 3:3p pM 'yt <br /> otatus:Accepted � <br /> Called Time: 8/28/2023 11:%AM �e <br /> •38 Ref�� 1A163859 n <br /> Customer:GILBARCO VE 6 e�T <br /> #; 1st Arrival: 8/28/2023 1:30 pM <br /> JI GVR ID:279356 order <br /> 1616 E Hammer Lane Work Gitbarco Completed: 8/30/2023 11:00 kM <br /> Stockton 95210 USA originator; <br /> i; <br /> ap Ia. Customer Notes 00 <br /> 8/30/2023 10:20 GVENEGASI but it also could a E <br /> -1 combo VR sensor box, dons normal <br /> ' active.I removed old brine sensor and installed new sensor. Alarm clear Found <br /> v72E I returned with hydro sensor.LB Still site with all fun <br /> LNCE OHMS low at 124K i called VR and per. if L8 fuel alarm returns fepilar ate2 <br /> NCE bad wire.sites next drop is in a few hours they will monitor additive alarms and LB.leaving �a2 <br /> VCE <br /> 8/28/2023 19:56 GVENEGASI <br /> ld <br /> I checked into site.LS fuel alarm on additive STP.found brine full,i shook sensor andalarm <br /> back.alarmttrriiggereetf i ags nu i Z <br /> call AIS and see if the could run remote test to see if additive is working.i never g rale <br /> will order new A 304 sensor and return ASAP C <br /> .�e cc <br /> 0 or <br /> Tasks <br /> D)en <br /> Task Number GteeO <br /> say 1 Console Console Prevent Maint <br /> ,dI / <br /> c <br /> � Parts <br /> Jot dan <br /> 'Entry Date Item Number Descripbon My <br /> 8!30/2023 03693N Sensor,Sgl Point,Mini Hydrostatic SN QUan it <br /> 1.0n <br /> Customer Signature <br /> Print Name A" <br /> Dato <br /> SRS ��163gsq S�f�l <br /> � h <br /> 28 23 <br /> lain 41A a <br />