My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5920
>
4100 – Safe Body Art
>
PR0548004
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 3:24:30 PM
Creation date
3/5/2024 9:14:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4100 – Safe Body Art
File Section
COMPLIANCE INFO
RECORD_ID
PR0548004
PE
4121 - BODY ART FACILITY-STERILIZATION
FACILITY_ID
FA0027381
FACILITY_NAME
LOST DREAMS TATTOOS & PIERCING (CARTER, MICHAEL)
STREET_NUMBER
5920
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
5920 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) Drain reservoir fill with clean distilled or demineralized water and run one <br />3 minute cycle (UNWRAPPED) at 132°C (270°F). <br />(d) Drain reservoir and allow ster- <br />ilizer to cool to room tempera- <br />ture. Remove the trays, tray <br />rack (1), and the tray plate (2). <br />This is accomplished by <br />grasping the tray rack (1) on <br />both sides in the front and <br />gently pulling outward. The <br />tray rack and tray plate should <br />slide out of the chamber <br />Together. <br />(e) Wipe out the inside of the <br />chamber being careful not to <br />damage the heater element or <br />the temperature and level <br />sensor components. Wipe off <br />.he trays, tray rack, and tray <br />olate. <br />MA439000 <br />(f) Re -install the tray rack (1) and tray plate (2) in the chamber as follows: <br />Position the two rear posts of tray rack in rack holes (A) of tray plate. <br />Then, hold front end of tray rack at approximately a 30° angle from the <br />tray plate. Then, insert rear end of tray rack and tray plate as an assem- <br />bly in chamber (3). Push tray rack and tray plate into chamber com- <br />pletely. Re -install the trays. <br />(g) Refill the reservoir with clean distilled or demineralized water. <br />2. Pe -form Pressure Relief Valve Check - The pressure relief valve must be <br />checked each month by a qualified person to be sure that the relief valve is <br />functioning properly: <br />
The URL can be used to link to this page
Your browser does not support the video tag.