My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0045251
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALKER
>
748
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0045251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 2:53:09 PM
Creation date
3/5/2024 11:57:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0045251
PE
4374
STREET_NUMBER
748
Direction
S
STREET_NAME
WALKER
STREET_TYPE
LN
City
STOCKTON
Zip
95215-
APN
15911026
ENTERED_DATE
2/2/2024 12:00:00 AM
SITE_LOCATION
748 S WALKER LN
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tylor McMillan's Well Service <br /> 9530 Hageman Rd.STE B#349 Bakersfield CA,93312 <br /> Phone:(916)761-5224 Email:tylor@wellblaster.com <br /> Website:www.wellblaster.com <br /> Date: February Z,2024 <br /> BLASTING WORK PLAN <br /> Well: 748 S Walker Lane Location:748 S Walker Ln flan date and time: fending <br /> Casing 10-inch[D Steel to 178 feet Stockton,CA <br /> A—Scaling pipe Boosters <br /> GL Density g/cc 1.55 g/cc <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> Detonator placed at 20 feet Casing Diameter 10 inches <br /> Charge Wt. 0.15 Kg 150 grams <br /> 50' Detonation pressure 207 k/bar <br /> Total energy ea. 13,997 k/bar <br /> Pressure at casing 26.73 k/bar 400,148 psi <br /> Pressure at 10 feet 0.00 29 psi <br /> 100' Explosive Cord <br /> Density g/cc 1.60 g/cc <br /> Detonation Velocity 22,000 ft/s 6,706 m/s <br /> Detonating Cord Casing Diameter 10 inches <br /> Start 20 feet Grains 100 gr/11 6.48 g/ft <br /> I;0' Intervals Linear <br /> End 178 feet Detonation pressure 180 k/bar <br /> Strength 100 grain Total energy pef ft. 44 k/bar <br /> Total 158 feet Pressure at casing 0.56 k/bar 8,330 psi <br /> *These are estimated pressure for a empty Ni ell <br /> 200 Site procedure <br /> 1. Check site and measure well depth <br /> 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe into the well <br /> 4. Pump sealing material to top of well <br /> 5. Check and clear blast area(sound blast warning) <br /> 250* 6. Arm explosives <br /> 7. Confirm area clear(final blast warning) <br /> 8. Detonate charge <br /> 9. Check hole and sound all clear <br /> 10. Refill cement to top of well to form a mushroom cap <br /> X00' <br /> Name of Blaster Preparing Plan: Tylor McMillan <br /> Total Explosives <br /> 2.21 lbs. *Tylor McMillan's Well Service reserves the right to change or modify the charge in <br /> 350' any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> 400' <br /> 450' <br />
The URL can be used to link to this page
Your browser does not support the video tag.