Laserfiche WebLink
® Department of Public Works <br /> Ali <br /> SAN JOAQUIN o <br /> G <br /> Fritz Buchman , Director <br /> COUNTY <br /> JAUM ;�7 <br /> C% .. <br /> 9CIFOR�\P Greatness grows here l u ff %\youAlex Chetley , DeputyDirector — Development <br /> Kristi Rhea , Deputy Director - Administration <br /> David Tolliver , Deputy Director - Operations <br /> March 29 , 2024 Najee Zarif, Deputy Director - Engineering <br /> MEMORANDUM <br /> TO : Community Development Department <br /> CONTACT PERSON : Makayla Miller <br /> �r <br /> FROM : Christopher Heylin , Development Services Engineer <br /> Development Services Division <br /> SUBJECT : PA- 2400027 ( Z) : A Zoning Compliance Review application to develop a 202 ' x <br /> 109 ' solar array system to support the agricultural irrigation system in the OS / RC <br /> ( Open Space/ Resource Conservation ) General Plan designation ; located north <br /> of E . Mariposa Road , 1 , 288 feet west of Kaiser Road , Stockton . <br /> ( Supervisorial District 4 ) <br /> OWNER : Aaron Giovara & Philip Russick APPLICANT : Cody Weber <br /> ADDRESS : 9345 E . Mariposa Road , Stockton APN : 181 - 040- 16 <br /> INFORMATION : <br /> The site is partially located in a Federal Emergency Management Agency Designated Flood <br /> Hazard Area designated as Zone A & X . <br /> Mariposa Avenue has an existing right- of-way width of 80 feet and a planned right- of-way width <br /> of 110 - 136 feet . <br /> RECOMMENDATIONS : <br /> 1 ) An encroachment permit shall be required for all work within road right- of-way . ( Note : <br /> Driveway encroachment permits are for flatwork only — all vertical features , including but <br /> not limited to fences , walls , private light standards , rocks , landscaping and cobbles are not <br /> allowed in the right- of-way . ) ( Development Title Sections 9 - 607 . 020 and 9 - 607 ) . <br /> 2 ) The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Improvement Standards Drawing No . 17 prior to issuance of the building <br /> permit . ( Development Title Section 9 - 607 . 040 ) . <br /> 3 ) The Traffic Impact Mitigation Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record . ( Resolution R - 00433 ) <br /> 1810 East Hazelton Avenue I Stockton , California 95205 T 209 468 3000 F 209 468 2999 <br /> [I Follow us on Facebook @ PublicWorksSJC Visit our website : www . sjgov . org /pubworks <br />