My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2026 8:16:00 PM
Creation date
3/13/2024 11:08:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231488
PE
2361 - UST FACILITY
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2501 JACKSON AVE ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JACKSON AVE. "S T .I OCR 0 w <br /> 000 <br /> Q L0 <br /> rI 0O�/ 0)1 of <br /> Y U <br /> f: klzw <br /> UO <br /> } w <br /> Ulm <br /> 0 � <br /> `t U <br /> Nr <br /> (e(2-DISPENSERS SCOPE OF WORK: <br /> L U <br /> 1. APPLY FOR COLD START PERMIT <br /> 2. SPILL BUCKET B OVERFILL VALVE tmli. <br /> TEST LEAN INSTALLATION LL'. <br /> DETECTOR SAW CUT AND a. SAW CUT,DEMO,AND HAUL ONE(1) lJi <br /> DEMO 4'X 4'AREA AROUND THE DIESEL U g <br /> SPILL BUCKET ,\ <br /> b. INSTALL FRANKLIN FUELING DOUBLE (�♦// <br /> T 91 OY F T ODIES LO WALL DEFENDER SERIES SPILL <br /> TEST LEAK BUCKET <br /> DETECTORS c. INSTALL DEFENDER SERIES <br /> jr 87 O 0V (D OVERFILL SHUT OFF VALVE ON THE <br /> Q DIESEL PRODUCT TANK <br /> 3. PROVIDE PRETEST OF SPILL BUCKET Y <br /> REMOVE BALL 4. REMOVE BALL FLOAT FROM THE 0 N <br /> FLOAT VALVE UNLEADED TANK tl o <br /> 5. PLACE#4 REBAR 18'ON CENTER EACH O <br /> WAY AND POUR BACK 2500 PSI CONCRETE a <br /> 6. PROVIDE PRETEST OF SPILL BUCKET 0 <br /> 7. PROVIDE MECHANICAL LEAK DETECTOR O <br /> TESTING OF PRIOR CONTRACTOR w ui <br /> INSTALLATION. r a <br /> 0 0 0 0 8. REPLACE CONCRETE WITH REBAR 18'ON ~ <br /> DOOR �fSO CENTER EACH WAY AND POUR BACK 2500 <br /> r.I PSICONCRETE > <br /> (e)YcELEi F»r 9. CALL FOR REQUIRED INSPECTIONS& W o <br /> ns ra o PROVIDE OPI INSPECTION(TESTING > <br /> COLD START 0 le)VENTS Y Q <br /> TLS 350 10.SUBMIT FINAL TEST RESULTS TO LOCAL Z rn <br /> MONITOR H CUPA O <br /> STORE PANEL (e)HTMK AS. I � U <br /> N Sao <br /> Q <br /> N W <br /> 0 <br /> m <br /> }ti <br /> ice/m <br /> u <br /> CCflS,INC-ISACA WISAJCL 11 40/ CONTRACTOR, f' <br /> LICENSE PB03818AIC�B11D40ID8lIHAZ, to <br /> AIL TECHNICIANS PERFORMING TESTS AND CERTIFICATIONS 9 ET <br /> ARE INDIVIDUALLY CERTIFIED BY THE EQUIPMENT <br /> MANUFACTURERS AND HOLD APPLICABLE INTERNATIONAL PG. 1 <br /> CODE COUNCIL(ICC)CERTIFICATES. <br />
The URL can be used to link to this page
Your browser does not support the video tag.