Laserfiche WebLink
JACKSON AVE. "S T ,l g0lCo <br /> Q M <br /> Q co <br /> L0 <br /> 0 rnafQ; Y Uf: <br /> cn z <br /> } w <br /> U13f � <br /> 0 � <br /> `t U <br /> (e) 2-DISPENSERS SCOPE OF WORK: <br /> L <br /> 1 . APPLY FOR COLD START PERMIT ffff <br /> 2. SPILL BUCKET B OVERFILL VALVE LA <br /> TEST LEAN INSTALLATION LL '. <br /> DETECTOR SAW CUT AND a. SAW CUT, DEMO, AND HAUL ONE (1) V i <br /> DEMO 4' X 4' AREA AROUND THE DIESEL U g <br /> SPILL BUCKET ,\ <br /> b, INSTALL FRANKLIN FUELING DOUBLE �& <br /> ( <br /> r 91 OY F r )DIES LO WALL DEFENDER SERIES SPILL I/ <br /> TEST LEAK BUCKET <br /> DETECTORS c. INSTALL DEFENDER SERIES <br /> jr 87 O 0V (D OVERFILL SHUT OFF VALVE ON THE <br /> Q DIESEL PRODUCT TANK <br /> 3. PROVIDE PRETEST OF SPILL BUCKET Y <br /> REMOVE BALL 4. REMOVE BALL FLOAT FROM THE 0 <br /> N <br /> FLOAT VALVE UNLEADED TANK tl o <br /> 5. PLACE #4 REBAR 18' ON CENTER EACH O <br /> WAY AND POUR BACK 2500 PSI CONCRETE a <br /> 6. PROVIDE PRETEST OF SPILL BUCKET 0 <br /> 1, PROVIDE MECHANICAL LEAK DETECTOR O <br /> TESTING OF PRIOR CONTRACTOR w ui <br /> INSTALLATION. r a <br /> 0 0 0 0 8. REPLACE CONCRETE WITH REBAR 18' ON ~ <br /> DOOR �fSO CENTER EACH WAY AND POUR BACK 2500 <br /> 14 PSICONCRETE > <br /> (e)V—E F»r 9. CALL FOR REQUIRED INSPECTIONS & W o <br /> ns ra 0 (e) VENTS PROVIDE OPI INSPECTION(TESTING W <br /> COLD START 10. SUBMIT FINAL TEST RESULTS TO LOCAL Y Q rn <br /> TLS TO H Z <br /> MONITOR CUPA p U <br /> STORE PANEL (e) H TANK cc) <br /> N ¢ o <br /> Q <br /> N W <br /> O <br /> m <br /> G}ti <br /> m <br /> lu <br /> CGRS, INC- IS A CALIFORNIA LICENSED CONTRACTOR, <br /> UC ENSE #000816 AIC�611040/D64IHAZ. N <br /> All TECHNICIANS PERFORMING TESTS AND CERTIFICATIONS yTA <br /> ARE INDIVIDUALLY CERTIFIED BY THE EQUIPMENT <br /> NANUFACTURERS AND HOLD APPLICABLE INTERNATIONAL <br /> CODE COUNCIL (ICC) CERTIFICATES. <br />