Laserfiche WebLink
CalRecycle <br />Transfer/Processing Facility Inspection Report (53) <br />of San Joaquin <br />Inspection <br />Inspector Also Present (Name) <br />Benjamin Escotto Ruben Ramirez <br />THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION 300E THE PUBLIC RESOURCES CODE (PRC) AND TITLE 14 AND TITLE V CALIFORNIA CODE OF REGULATIONS (CCR) <br />X No Violations or Areas of Concern <br />Routine monthly inspection conducted on this date and the following was noted: <br />1. The "retaining wall" was taken apart and moved forward away from the east wall of the transfer station. <br />2. The onsite litter and dust was minimal. <br />3. The fire extinguishers and rodent bait stations were being properly maintained. <br />4. All records were available for review. <br />