My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 11:46:25 AM
Creation date
3/21/2024 3:50:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0508352
PE
2361 - UST FACILITY
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3355 E HAMMER LN STOCKTON 95212
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) Regular Premium <br /> Are both vent and tank riser piping Yes Yes r Yes r Yes <br /> secondarily contained? r No No r- No r- No <br /> OPE Model Franklin/EBW Franklin/EBW <br /> W Shut off W Shut off ' Shut off ' Shut off <br /> Flow Flow Flow Flow <br /> ' Restricts ' Restricts ' Restricts ' Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) '- Audible ' Audible ' Audible l Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual ' Visual ' Visual ' Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? l: No No r No r No <br /> At what level in the tank is the OPE set to 103 103.5 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 93.4 93.9 <br /> Is the OPE in proper operating condition to r Yes Yes r Yes r- Yes <br /> respond when the stored substance reaches r No No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results r Pass Pass Pass Pass <br /> r Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> ''- Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.