Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />T-1 RUL <br />Tank ID (one OPE per column) <br />Are both vent and tank riser piping <br />Yes <br />Yes <br />r Yes <br />r Yes <br />secondarily contained? <br />r No <br />No <br />r- No <br />r- No <br />OPE Model <br />oPW <br />Shut off <br />Shut off <br />Shut off <br />Shut off <br />Flow <br />Flow <br />Flow <br />Flow <br />' - Restricts <br />Restricts <br />'- Restricts' <br />- Restricts <br />What is the OPE response when activated? <br />Flow <br />Flow <br />Flow <br />Flow <br />(Check all that apply) <br />'--- Audible <br />Audible <br />' - Audible <br />Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />'--- Visual <br />'- Visual <br />'--- Visual <br />'--- Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />r Yes* <br />Yes* <br />r Yes* <br />r Yes* <br />that may interfere with the OPE operation? <br />l: No <br />No <br />r No <br />r No <br />At what level in the tank is the OPE set to <br />activate? (Inches from bottom of tank) <br />100.125 <br />What is the percent capacity of the tank at <br />which the OPE activates? <br />94.3 <br />Is the OPE in proper operating condition to <br />r Yes <br />Yes <br />r- Yes <br />r- Yes <br />respond when the stored substance reaches <br />the designated regulatory level? <br />r No <br />No <br />r No <br />r No <br />7. SUMMARY OF TESTING RESULTS <br />r Pass <br />Pass <br />Pass <br />Pass <br />OPE Inspection Results <br />r Fail <br />Fail <br />r- Fail <br />r' Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />*Mark here if: <br />'--- Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />