My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 3:13:09 PM
Creation date
3/21/2024 3:51:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0508452
PE
2361 - UST FACILITY
FACILITY_ID
FA0007787
FACILITY_NAME
7-ELEVEN INC #41341
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4405 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 13. DI1MPf.E MST HOLE <br />kerrmove tool. Remove any chips or burrs frcrn ttke d riW <br />ing operation. Place the assem bly on a solid surface. <br />Using the punch supplied v6th the 71SO-70OL, 715O- <br />T0(XC, and 71SO-TOOLC, align the tip of the pund3 <br />with t drgkd hak and d1m9le tiles upp& drop tube by <br />striking the punch with a hammer until thedrop tube is <br />formed kvto countersunk hole in the inlet tube. After <br />purdhing, Gemoveany eh'ps that may have fallen into <br />the ink -t Cube screw hofe- <br />Figrrrr 73 <br />STEP 14: ASSEMBLE FIRST SCREW <br />Ensure that the drop tube was farr+►ed kno the rou nter- <br />sunk strew hole as shown In Figure 14 If rpt return to <br />Step 13. Apply black maly grease to screw and tigtrten <br />first screw into Inlet tuts with a screwdriver. Use only <br />the taptite screws that are supplied with d'.e unit Seat- <br />ir,9 torque Is 2O in-ibs min. to 3S in-tbs rrrasc Screw head <br />should be flush with t drop tube, Vo not over tlght- <br />en <br />e�we4a�oQ.�ra�.�.s iao <br />Nure 14 <br />STIEP IS: DIMPLE REMAINING HOLD <br />Remove any ch Ips w burrs ft n the dr%Ing opemtbn. <br />N mole the next t j Moles as done in Step 13. Make su re <br />the assembly Is on a solid surface when punchi n9- After <br />punching, irenv" any chips that may haw fallen into <br />the inlet tube snow hole. <br />Align punch with <br />drilled hole <br />Figunt 15 <br />STEP 16: ASSEMBLE OTHER SCAEtiAI'S <br />Apply black rroty grease to screws ar�d tighten the oth- <br />er (2) screws into in let -tube with a screweldwr as done <br />In Step 1 it. Use only the tAptite screws that are su pplied <br />wfth Lhe YnIL Searing torque Is 20 in Abs rnim to 35 in <br />lbs max, DD not over tghteri. <br />STEP 17: APPLY GREASE TO LOWER D-#iMG AND <br />BODYTHREADS <br />Apply black molt' grease to the lower tube o -ring and <br />body t hr+eads as shown. Ntapke sum coverage i5 Com- <br />pletely around <br />ormpietelyaround the o -ring. In5wil o -ring in gnxhe just <br />above threads, <br />Apph►grease <br />around r. ring <br />O�ingr �` <br />grooveaeyrt-ras <br />10 <br />FE <br />
The URL can be used to link to this page
Your browser does not support the video tag.