My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 3:13:09 PM
Creation date
3/21/2024 3:51:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0508452
PE
2361 - UST FACILITY
FACILITY_ID
FA0007787
FACILITY_NAME
7-ELEVEN INC #41341
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4405 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO Olrarfiit Valve Uppor Tube Calculnew wcwjLshW <br />Imp2dum Thh is trutaret to be mental Wort" and not a such to follow" the Iatsfladen <br />manual Instru Wrm All length rneasuraytWM are In Mus. Please oont■cl the Authority t#avk* krrisd lc. <br />tion {AHI) tend ra!eiaw kwmL state, and national codes to de rmimthe mquWbwy n*quirrem retsgwawning <br />shut Iff caps ft in your regiark as ►reit as taim init account other consklomtkm such as exbwm tank t1k. <br />l7e5ifed tank capacity for sihurt-ofd <br />Dipstick Number an Tank Chart that Corresponds to 10096 volu me (Y) <br />Dipstick Number on Tank Chart that corresponds t o SO% { } = L= (-x) <br />Upper Tube Reference Number �-Y-X Ij () <br />Upper Ttbe Depth in side Tarsk C = -2' <br />Divance f rom top sea Ming surface faf 7150 tip' to inside *w (C) <br />top of Storage Tank' At - - . <br />F <br />1 rr all cases for Dw--rr & 71 SD nledeK the top of the valve body mura promWe at least 6 %' I n to the tank to <br />provide a minimal clearance for proper operation.} Add monally the tonal Upper Tulse Length must be at beast Ii' <br />of length to include the p"eajve bend in t hu tube - <br />Is C l -ss than 6 W Yes / No <br />+f N04 Upper Tube Long It lD)� C + A <br />if YM Upper Tube LwVM (D�=6'h'+ A <br />Upper Tubo Length = <br />In all rases fear t&h 7150 models, We tnp Of the valve body must protn,de art least 6186 into the unkto pro idc <br />a mlriIrnal clearance for proper operation,; Additionally rhe total Upper Tune Length must h-eat least 14 W of <br />iength to include the protective bend in the tube. <br />Is C less than 5' Yes 1 No <br />It PXX UOha "tuba Lmoyth (D)- C -4- A - t '1 <br />if M Upper Ake Lmq& {D} r 6 46' * A - 1 V2 " <br />Upper Tube Length = <br />' seoi;rig surface may be the top of Me Farr Scud Adaptor, the bu* En sealing kdge inside tome sp M ran Wncm or on nm-mpar <br />right app icanon-C the rvp of the pipe nWkp <br />r Smw llrrdefgfWhd5rOM9V tanks urilbro manwaysysrem at ON tap. Maker sum ray use ON rapaf V*storm ran# dorm2Oswe- <br />mentandnatiotopofthemarrwcy. Cmsuityour undugnmm-dCan* nanufacfw rfbeheightofthemanway <br />" <br />Mks rrrecsurmemr is raken horn ft seam r+rf►c+t: the uApurabe is attactwdta rhe PoW body &D rhe insIdeofrheTank top. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.