Laserfiche WebLink
Compostable Materials Handling Operation and Facility Inspection <br /> Report ( 93 ) <br /> Central Valley Compost ( 39-AA-0051 ) <br /> 4/5/2023 <br /> NOTES : <br /> 1 . The Area of Concern for leachate control has been corrected . Per operator , gravel is being <br /> used to fill in depressions . The area being worked on was taped to prevent through traffic from <br /> accessing the area . <br /> 2 . The odor was light and track out was light to moderate . Track out is swept by a Sweeper <br /> twice a week , per operator <br /> 3 . The following temperatures were measured during the inspection : <br /> - Raw green waste was 164 ° F . <br /> - Ground green waste was 150 ° F . <br /> - Windrows ranged from 120 ° F to 140 ° F . <br /> - Finished product ranged from 124 ° F to 132 ° F <br /> - Biosoil was 82 ° F <br /> - Overs were 96 ° F <br /> - Finished compost was 144 ° F <br /> 4 . Records are received by email . <br /> 5 . Q1 S131 383 measurements were received by the EHD on April 4 , 2023 . <br /> 6 . Flies were not observed . <br /> 7 . Per operator , the facility is currently working on vegetation control . <br /> 8 . Multi Bang cannon and Screamers are used for bird control . <br /> Attachments <br /> Central Valley Compost Photos <br /> CalRecycle Solid Waste Information System ( SWIS ) Page 2 of 2 <br /> M . A. . A .. : l 40 nnnn r% . AA ARA <br />