Laserfiche WebLink
Compostable Materials Handling Operation and Facility Inspection <br /> Report ( 93 ) <br /> Central Valley Compost ( 39-AA- 0051 ) <br /> 11 /27/2023 <br /> NOTES . <br /> 1 . The Area of Concern for Vectors/ Litter/ Hazard/ Nuisance/ Noise/ Dust has been corrected . <br /> Garbage bags of litter have been removed and light litter was observed during the inspection . <br /> 2 . Staff was observed picking up litter . Litter not observed on neighboring properties . <br /> 3 . The following temperatures were measured during the inspection : <br /> - Raw green waste was 82 ° F <br /> - Ground green waste was 106 ° F <br /> - Windrows ranged from 130 ° F to 144 ° F <br /> - Finished product ranged from 122 ° F to 128 ° F <br /> - Biosoil was 84 ° F <br /> - Overs were 94 ° F <br /> - Finished compost was 120 ° F <br /> 4 . Records are received by email . Records are meeting standards . <br /> 5 . Per operator, Orkin was at the facility earlier in the day to service the fly bait stations . There <br /> has been an increase in the amount of flytraps at the facility . <br /> 6 . Water truck is used for dust control . <br /> 7 . Track out was light . <br /> 8 . The weather during the inspection was 61 OF with a wind speed of 2 mph . <br /> Attachments <br /> Central Valley Compost Photos <br /> CalRecycle Solid Waste Information System ( SWIS ) Page 2 of 2 <br /> f1 ... 1 .. !'� .. ... ... .... 1 .. A . I'1 ,,. .. .,. ..... L. .. .. C elnn7 4 on A r"IR A <br />