Laserfiche WebLink
Compostable Materials Handling Operation and Facility Inspection <br /> Report ( 93 ) <br /> Central Valley Compost (39-AA- 0051 ) <br /> 12/27/2023 <br /> NOTES : <br /> 1 . Track out to Frewert Road was heavy . Per operator , a sweeper sweeps the road <br /> approximately 2 to 3 times a week . Operator is to increase the frequency of sweepings during <br /> poor weather conditions to prevent track out to Frewert Road . <br /> 2 . Ponding observed north of the windrows and south of the facility entrance . Operator shall <br /> grade the surface to prevent future ponding . <br /> 3 . Records are received by email . <br /> 4 . A November lab analysis report (sample date 11 / 15/23) indicated the sample exceeded the <br /> state minimum standards for fecal coliform . Operator had the material retested on December <br /> 211 2023 , at which time , the sample met the state minimum standards . <br /> 5 . Odor was light and flies were not observed . <br /> 6 . The weather during the inspection was 45 ° F with a NW wind speed of 5 mph . <br /> 7 . Theofollowing temperatures were measured during the inspection : <br /> - Raw green waste was 110 ° F <br /> - Ground green waste was 104 ° F <br /> - Windrows ranged from 134 ° F to 148 ° F <br /> - Finished product ranged from 130 ° F to 132 ° F <br /> - Biosoil was 92 ° F <br /> - Overs were 96 ° F <br /> - Finished compost was 166 ° F <br /> Attachments <br /> Central Valley Compost Photos <br /> CalRecycle Solid Waste Information System ( SWIS ) Page 2 of 2 <br /> 11 .mka ,.. f'+ ... ... .. .... a .. .J . I .. ... . . .. ... , .t4 nnnA non A h A <br />