Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> 89 <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping r Yes Yes r Yes Yes <br /> secondarily contained? r No r No No r No <br /> OPE Model oPw <br /> r Shut off r Shut off F Shut off r- Shut off <br /> Flow Flow Flow Flow <br /> r` Restricts r Restricts ru Restricts r Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) r- Audible r' Audible r Audible �` Audible <br /> Alarm Alarm Alarm Alarm <br /> r- Visual r Visual r- Visual f Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* Yes* r Yes* <br /> that may interfere with the OPE operation? No No r No No <br /> At what level in the tank is the OPE set to 79.375 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> 94.1 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to r: Yes r Yes r Yes Yes <br /> respond when the stored substance reaches r No r' No r No No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> r: Pass Pass Pass r Pass <br /> OPE Inspection Results r Fail Fail r Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> RUL. AND PUL. NIPPLES WHERE SIEZED AND WAS NOT ABLE TO REMOVE DROPTUBES MUL. <br /> DROPTUBE PASSED. <br /> *Mark here if: <br /> I` Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />