Laserfiche WebLink
L Drill 71 SO INM O"gram <br /> 3. Rannmer _ t' upper I-Ring Gasket <br /> 4. Tape measure <br /> S. Hacksaw or cut-off saw,fine tooth;24 teethAnch re' Y 3 <br /> S. Fine half round File - Inlet Tube <br /> 7, Screwdriver-Phillips blade Pdypdk Seal <br /> 8. Fine grit sandpaper/steel wool <br /> 9. Grease,Nack mo ly <br /> 10, Torque Wrench <br /> 11. Band clamp (3-3/4"diameter minimum) <br /> 12- }AMBLE MCWAS ONLY; rivet tool for 118'ma n- <br /> drew,crirnpinq tnd f pliers,wire cutter/scissors, Upper Drop Tube <br /> pipe dope, 1M"square drive extension or 318' <br /> square drive extension with 318'to 114`socket : <br /> Aria pter. �� <br /> WARNIN <br /> Valve Body <br /> Using ekctrkal1ygnratW equipment near gasoline <br /> or gasoline vapors may rasult in fire ar explosion, <br /> causing personal injury and Ply damage. Float <br /> Check to assure the working area Is iw from such <br /> hazards,and always use proper precautions. - <br /> Lower O-Ring <br /> IMPOWANT:The figures In this installation and <br /> maintenance instruction may contain vapor retovwy <br /> equipment(including model numbers)that is not cern- <br /> ed by the Califomia Air R4source5 Board(CARS)for a <br /> specik Phase I Vapor Recovery 5ysMm. please referto <br /> Exhibit t of the appropriate GARB Phase I Executive Or- <br /> der for a list of certified Phase I Vapor Recovery system <br /> Equ ipnlenL Lower Tube <br /> roNiotez <br /> �components are thesane except theaptor&cable asse,nh;y,rivet tesaablc,and fenvle. <br /> Socket Adaptor&Cable <br /> Assembly <br /> Rivet <br /> Ferrule <br /> Testalsie Inlet <br /> I ube <br /> 3 <br />