My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> 87 91 <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping r Yes r Yes r Yes r Yes <br /> secondarily contained? r No r No r No r No <br /> OPE Model OPw OPw <br /> I✓ Shut off r Shut off r Shut off r Shut off <br /> Flow Flow Flow Flow <br /> r Restricts r Restricts r Restricts r Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) r Audible Ii Audible r Audible r Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual r Visual r Visual r Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? r No r No r No r No <br /> At what level in the tank is the OPE set to 78.875 78.5 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> 93.1 93.3 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to r Yes r Yes r Yes r Yes <br /> respond when the stored substance reaches r No r No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results r Pass r Pass r Pass r Pass <br /> Fail r Fail r Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> Reg.jack screw kit was bent upon arrival.. both drop tubes tested and passed... <br /> *Mark here if: <br /> r Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.