My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPORTANT: The instuctiorrs below for the 7150 Upper Tube Length=C t-(A) <br /> Overfill Pmenfte Valve ars written for the inhiml <br /> stege sltMtafFat 95%,but ois bR adjusted to sfiutoff Far testable tnat#els only,tr+ditry in"T": <br /> at any►desired teak upacytlr. Pleats 0=160 tllw Au- upper Tube kangth=C+)A)- t-7l2" <br /> Charity gloving Jurh0ktion (AH.1)and reviser;=L <br /> stats,and nattoni cedes to detwmJno the regulato- YES Upper tube length is 6-1/3"pkts the riser pipe <br /> ry ragts;w.monu gowerning shut-of capadrty in your measurement(A). <br /> regiom as well as take into accocl d other conskiwa- <br /> tkww mKh as extrema tank tilt. ht all gasars,the up- Upper Tube Length= 611?+(A) <br /> pair tube must proVudo into tha tank tit least 6 712' <br /> to artatxe the the valve un shut 00 noir been the For testable models oci lx, ending In'T. <br /> tank complaWy before the top of the Wk Js mAted Uppw Tube Length=6-1/2'+(A)-1-1/2' <br /> as per EPA regt,tImmi*nts. <br /> NOTA You t,rttan find tha actwal tank aoaciey nurtl- <br /> NOW TO LOCATE THE POSITION Of TH E 7150 AT bey that cnnelates to the 6-1 Ir+(A)depth for tete <br /> 05%TANK CAPACITY station racelods. This number" y►also ba used for <br /> iSAw-a0pvtnts am be adjusted to oey capacky to the purpou"of caltbroung an UkK-a ok tank iewt <br /> caarply wdfh AftJ Re4ukerrlentsl systern- <br /> The length of the upper tube and the placement of&ie Tape twos m <br /> 71 SO vaJve body deter r 9i ne the shut-off point. FoA low- <br /> ing the standard ios►rycuons for the DPW 7150 will pro- <br /> vrdrfor irrltfal sturtolf at 9Sg6. �n all cases,the upper <br /> wbe length must be a minimum of 6-112" plus the <br /> Length of the riser pipe- AV length medsuroments are In <br /> inches. <br /> RAW Pipe <br /> INSTRUCTIONS with Fane (A) <br /> t) Nrld tankTa <br /> capdttty rrt gaJl'ors; from tank�J�bratlar, Saa4Adaptor Tv nkLa} <br /> chart prLo')ov4ed by tank manufactuter. To 10* <br /> 2) Calculate 95%ofcapa6ty Top <br /> T - <br /> 3) Locate the 95%volume n urr►ber on the tank ca7ibrrar <br /> tion Chart. <br /> 4) r:1W the d4xdck number(X)which corresportds to <br /> the 95%tank volume. And,Find the dpstick num- Figum 2 <br /> ber(Y)which corresponds to the 100%volurrre. <br /> 5) 5ubtracx the dipstick number(X)from the tank di- EXAMPLE <br /> arneter(Y)to find t1he uppoy tube reference number <br /> CZ)- 1) For an Owens�arning Model G-3 Fiberglass Tank <br /> Calibration Chart~ <br /> (Y) -(1() = (Z) Tanis Cap&Lity- 10,OW 94,nornlnal 9,403 gal. <br /> 6) Subtract 2-from (Z)to find the upper tube depth iNOTF: U"actual aparq arft <br /> (i). 2) 95%of actual tank<apacli y=0.95 x 9403 gal._ <br /> (Z)-X-C 8933 gal. <br /> ss than 6 1J2'� 3) The closest number which;,less than 8933 W1.is <br /> 71 li C Ce <br /> $910 gat.Choosing tt,*c>5e" number less titian <br /> 95%of actual capaclty ensures that Vie inFtial <br /> NO Upper tube Ienyth is C plus the distance from shutoff wdl occur when d*tank Is no inure than <br /> the top Df the Face Seal Adaptor installed on 95%f ill- <br /> the riser pipe to the insJde,top lip of the storage .4) The calibration chart roapd1w of 6910 ya1.corTe- <br /> tank(A). sponds tv a dipstick measuremem of 82'. <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.