Laserfiche WebLink
Compostable Materials Handling Operation and Facility Inspection <br />Report (93) <br />Forward Resource Recovery Facility (39 -AA -0020) <br />10/24/2023 <br />2. The following temperatures were measured during the inspection: <br />- Incoming green waste was 90°F. <br />- Ground green waste was 96°F. <br />- Windrows ranged from 146°F to 160°F. <br />- Finished compost was 142°F. <br />- Finished product was 128°F. <br />- Overs were 151°F. <br />3. Fly bait stations contained bait and is being utilized. Additional traps have been placed <br />throughout the site. <br />4. Odor was light. <br />5. Track out to Austin Rd. was light. <br />6. Staff observed picking up litter on the site. Litter was not observed on neighboring <br />properties. <br />7. Operator is in the process of decreasing the padding in the green waste holding area. <br />8. A lab analysis report was provided for September and October. Article 7 requirements are <br />being met. <br />9. A winterization plan was submitted to the LEA on October 11, 2023. <br />Attachments <br />Forward Resource Recovery Facility Photos <br />CalRecycle Solid Waste Information System (SWIS) Page 2 of 2 <br />