Laserfiche WebLink
Environmental Health Department <br /> SAN JOAQUIN <br /> COUNTY Jasjit Kang , REHS , Director <br /> - - Muniappa Naidu , REHS , Assistant Director <br /> Vreatness grows herr . <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Steven Shih , REHS <br /> Elena Manzo , REHS <br /> Natalia Subbotnikova , REHS <br /> Ap ri 122 , 2024 <br /> To . San Joaquin County Community Development Department <br /> Attention : Sol Jobrack <br /> From : Rena ' LeRoy ; ( 209 ) 616 - 3021 <br /> Environmental Health Specialist <br /> RE : PA - 2400065 ( Z ) , Application Referral , S00016186 <br /> 4242 E Mariposa Rd , Stockton <br /> The following requirements have been identified as pertinent to this project . Other requirements <br /> may also apply . These requirements cannot be modified . <br /> 1 . Applicant shall contact Natalia Subbotnikova , Program Coordinator , Small Public Water <br /> System Program , at ( 209 ) 468 - 0338 , to determine if the existing well can be permitted as <br /> a public water system prior to issuance of building permits . If a public water system is <br /> required , applicant shall submit a Small Public Water System preliminary technical report <br /> to the California State Water Resources Control Board , Division of Drinking Water ( Water <br /> Board ) at least six months before initiating construction of any water related improvement , <br /> as defined . The issuance of a permit to operate a small public water system by the local <br /> primacy agency ( EHD ) is prohibited without the concurrence of the Water Board . Please <br /> contact Gena Farley with the SWRCB Division of Drinking Water at <br /> Gena . Farley@waterboards . ca . gov or 209 - 948 - 7488 , concerning the requirements for <br /> preliminary technical report submittal prior to issuance of building permits . <br /> If the Water Board determines that an onsite well shall be used as the potable water <br /> source , a permit application to operate Small Public Water System shall be submitted to <br /> the EHD for approval prior to issuance of building permits . To issue a permit to operate , <br /> concurrence from the Water Board is required . A yearly permit to operate a public water <br /> system will be required by the EHD prior to sign off of the certificate of final occupancy <br /> ( San Joaquin County Development Title , Section 9 - 602 . 010 and 9 - 601 . 030 . ) . <br /> The supplier must possess adequate financial , managerial , and technical capability to <br /> assure delivery of pure , wholesome , and potable drinking water in accordance with San <br /> Joaquin County Development Title , Sections 9 - 602 . 010 and 9 - 601 . 030 and C . C . R . , Title <br /> 22 , and Health and Safety Code , Section 116525 116570 . <br /> 2 . Before any hazardous materials /waste can be stored or used onsite , the owner/ operator <br /> must report the use or storage of these hazardous materials to the California <br /> Environmental Reporting System ( CERS ) at cers . calepa . ca . gov / and comply with the <br /> laws and regulations for the programs listed below ( based on quantity of hazardous <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468 - 3420 F 209 464 - 0138 1 www , sjgov . org /ehd <br />