Laserfiche WebLink
SAN ,,] DAQ U I <br /> N Environmental Health Department <br /> C C u T IV AMENDED <br /> 3/19/2024 <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> SGS Stockton-Carpenter Road 4863 CARPENTER RD, Stockton March 14, 2024 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> OBSERVATION: The current Spill Prevention, Control, and Countermeasure(SPCC)dated 9/25, 2019, did not fully <br /> follow the order or requirements of 40 CFR Part 112.7. <br /> The followings cross-referencing sections on page v-vi of the SPCC plan were inaccurate: <br /> 1. The is no 3.3.3 subsection included under the Operations, Discharge Prevention Measures, and Containers <br /> and Positioning of Mobile and Portable Containers Section. <br /> 2. The Designated Responsible Person refers to the Introduction section for cross-reference. However,The <br /> Designated Responsible Person is addressed on page 1 of the SPCC plan. <br /> 3. The Discharge Prevention Measures are discussed in section 4 not in section 3 as cross-referenced in the <br /> plan. <br /> 4. The Contact list required by section 112.7(a)(3(vi)of the regulation and addressed in section 5 is not included <br /> in the cross-reference table. <br /> REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a <br /> Plan in accordance with good engineering practices.The Plan must have the full approval of management at a <br /> level of authority to commit the necessary resources to fully implement the Plan.You must prepare the Plan in <br /> writing. If you do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan <br /> acceptable to the Regional Administrator that meets all of the applicable requirements listed in this part, and you <br /> must supplement it with a section cross-referencing the location of requirements listed in this part and the <br /> equivalent requirements in the other prevention plan. If the Plan calls for additional facilities or procedures, <br /> methods, or equipment not yet fully operational,you must discuss these items in separate paragraphs and must <br /> explain separately the details of installation and operational start-up. <br /> CORRECTIVE ACTION: Ensure that your SPCC Plan follows the required SPCC rule sequence and/or includes <br /> adequate cross-reference. 2. It is prepared in accordance with good engineering practices. 3. Has the full approval <br /> of management at a level of authority to commit the necessary resources to fully implement the SPCC plan.4.The <br /> plan is in writing. 5. The plan addresses additional procedures/methods/equipment not yet fully operational. <br /> Provide proof of correction to the EHD. <br /> This is a minor violation. <br /> FA0005712 PR0538368 SCO01 03/14/2024 <br /> EHD 28-01 Rev.12/06/2021 Page 7 of 15 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />