Laserfiche WebLink
Item Task Status Comments <br /> 5.2.3 Expansion Check that the valve is eS I. No* <br /> relief valvae in the proper L;N/A <br /> orientation.(Note that <br /> fuel must be <br /> discharged back to the <br /> tank via a separate <br /> pipe or tubing.) <br /> 5.2.4 Solenoid Cycle power to valve GYes DNo* <br /> valves to check operation. IRNA <br /> (Electrical solenoids <br /> can be verified by <br /> listening to the plurger <br /> opening and closing.If <br /> no audible <br /> confirmation,the valve <br /> should be inspected <br /> for the presence and <br /> operation of the <br /> plunger.) <br /> 5.2.5 Fire and a.Manually cycle the Yes 1 iNo* <br /> shear valves valve to ensure IIA <br /> components are <br /> moving freely and that <br /> the valve handle or <br /> lever has clearance to <br /> allow valve to close <br /> completely. <br /> b.Valves must not beYe� No` <br /> wired in open position. �1�lJA <br /> c. Make sure fusible YeS N6 <br /> element is in place IA <br /> and correctly <br /> positioned- <br /> d. Be sure test parts _Yes No* <br /> are sealed with plug 4A <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.3 Interstitial Check condition of LY�I :No* <br /> Irak detection equipment,including: NIA <br /> equipment . The window is <br /> clean and clear In <br /> sight leak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> a livable. <br /> STI SPODI UAL <br />