My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
4863
>
2800 - Aboveground Petroleum Storage Program
>
PR0538368
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 9:37:12 AM
Creation date
4/16/2024 2:57:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0538368
PE
2832
FACILITY_ID
FA0005712
FACILITY_NAME
SGS Stockton - Carpenter Road
STREET_NUMBER
4863
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
Stockton
Zip
95215
APN
17905010
CURRENT_STATUS
01
SITE_LOCATION
4863 CARPENTER RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Task Status Comments <br /> 5.2.3 Expansion Check that the valve is eS I. No* <br /> relief valvae in the proper L;N/A <br /> orientation.(Note that <br /> fuel must be <br /> discharged back to the <br /> tank via a separate <br /> pipe or tubing.) <br /> 5.2.4 Solenoid Cycle power to valve GYes DNo* <br /> valves to check operation. IRNA <br /> (Electrical solenoids <br /> can be verified by <br /> listening to the plurger <br /> opening and closing.If <br /> no audible <br /> confirmation,the valve <br /> should be inspected <br /> for the presence and <br /> operation of the <br /> plunger.) <br /> 5.2.5 Fire and a.Manually cycle the Yes 1 iNo* <br /> shear valves valve to ensure IIA <br /> components are <br /> moving freely and that <br /> the valve handle or <br /> lever has clearance to <br /> allow valve to close <br /> completely. <br /> b.Valves must not beYe� No` <br /> wired in open position. �1�lJA <br /> c. Make sure fusible YeS N6 <br /> element is in place IA <br /> and correctly <br /> positioned- <br /> d. Be sure test parts _Yes No* <br /> are sealed with plug 4A <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.3 Interstitial Check condition of LY�I :No* <br /> Irak detection equipment,including: NIA <br /> equipment . The window is <br /> clean and clear In <br /> sight leak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> a livable. <br /> STI SPODI UAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.