Laserfiche WebLink
Monthly Poly Tank Inspection Form <br /> rrE TANK IV <br /> (. SEVERITY INSPECTED BY: v a -7 <br /> 9W;0� C1J <br /> r � <br /> Z <br /> LU LU <br /> ITEM z ITEM <br /> Q D LL U <br /> C3 V <br /> Q W LU z [±} <br /> Q Z 0 2 m <br /> EQUIPMENT INSPECTION TANK INSPECTION <br /> Arees cracked or broken? Is the tank damaged (e.g. dented, discolored,or <br /> p p flaking)? <br /> Is there damage to pipes from vibration, Is there bending or swelling of the tank wall that is <br /> expansion, settlement, or impact? different from normal expansion? <br /> Are there leaks or drips(unusual Does the tank wall feel spongy? <br /> moisture) along the pipe runs? <br /> Is the tank fid broken or missing? Are cracks visible without using a detailed <br /> inspection test(listed below)? <br /> Are fittings or flanges pulling away from INTEGRITY TESTING <br /> the tank? <br /> Are the tanks, pipes,and fittings Complete one or both tests it any response other than"okay"is <br /> _ adequately supported and secured? checked on a lank inspection question <br /> Are valves or gaskets misaligned, loose, BLACK MARKER TEST—for a specific area <br /> brittle,or deteriorated? Are stress cracks visible in the tested area? <br /> Are pumps and other equipment LIGHT TEST—for the whole tank <br /> adequate for the workload? Are stress cracks visible? <br /> Are plumbing fittings or hoses loose, Complete test it stress cracks are observed. <br /> Recheck for stress cracks after baseball bat lest <br /> broken, or worn? <br /> Do pumps or other equipment need BAT TEST—for affected areas <br /> servicing or replacement? Did the impact affect the tank? <br /> MM <br /> (- e <br />